ASSESMENT
TASK |
||
MAY 2010 |
POWER SUPPLY LOAD TESTER |
By: N Despinidic |
INTRODUCTION
This assessment task
consists of two parts. You need to produce a working model of the “Load Tester”.
Secondly you need to produce a report showing the cost of the total unit. This
report needs to be neat and legible and written in a way that a production
manager can work out his cost for as many units as he wishes to make.
You will be
provided with:
·
The PCB.
·
A copy of the parts layout.
·
A copy of the overlay.
·
All parts to complete the project excluding the plastic box.
PROCEDURE
You may wish to use the copy of the overlay as a visual panel on your board.
In this case you need to cover it with a clear plastic sheet and drill holes
for the components.
1.
Drill
out the mounting holes so that the screws for the GPO box fit easily.
2.
Drill
out the holes for the 5watt resistors so that they are easily placed.
3.
Clean
the ends of the 5watt resistors so that they solder easily.
4.
Mount
the “Molex 20way socket to the board and solder.
5.
Place
the rest of the components on the board and solder as you require.
6.
Check
each solder joint for integrity. It should be shiny, and not have too much solder around it yet enough
to be a strong joint.
7.
Align
the component the same way for easy reading of their values.
8.
When
finished arrange for a GPO box to mount the unit.
9.
Parts
shown without values may be left out.
10.
Bend the
resistors neatly before inserting in to position.
11.
Note the
polarity of the diodes as per instructions.
PART TWO
You need to produce a report showing the cost of each
item and the total production cost for the unit.
|
LED CONFIGURATION |
|
|
|
|
|
|
COMPONENT LAYOUT
|
|